Ghana news briefing
Kpong Treatment Plant resumes water production after pipeline repairs – GWL
Ghana Water Ltd (GWL) has completed the replacement of weak sections of the Kpong-Tema transmission pipelines and resumed water production at the Kpong Treatment Plant.
Ghana Water Ltd has completed repairs on the Kpong-Tema transmission pipelines and resumed water production, but says supply will return gradually.
Ghana Water Ltd has completed repairs on weak sections of the 21-inch and 42-inch Kpong-Tema transmission pipelines.
This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.
Original sources
1 reportsMore stories
View all news
There’s absolutely nothing wrong with it – COCOBOD defends new Cocoa Bill amid minority attacks

Minority has opposed Cocoa Bill from the onset – COCOBOD

We should smile at our dogs – a new scientific study reveals why

England set to eliminate hepatitis C

Nvidia gets $500bn from major investors to develop AI infrastructure

At least 132 killed in Colombia’s largest earthquake in years
Watch related
All videosDon’t stop here


