Ghana news briefing
ECG loses about 27% of electricity through technical, commercial losses – Engineer

Technical losses occur as electricity travels through transmission and distribution infrastructure, while commercial losses may result from illegal connections, meter tampering, inaccurate billing and failures in revenue collection.
Electrical Engineer Hesford Quaye-Larbi has disclosed that the Electricity Company of Ghana (ECG) loses about 27 per cent of the electricity it receives for distribution due to technical and commercial challenges.
The electrical engineer maintained that recovering a substantial portion of the estimated 27 per cent losses could provide resources to strengthen the power sector without necessarily increasing electricity tariffs.
This is a summary of the original articles listed below. Always read the source articles for the full context. GhanaSummary does not create or modify the news — we summarise and link to original publishers.
Original sources
1 reportsMore stories
View all news
Police arrest 6 for allegedly killing tricycle rider over failure to make sales

Telecel Ghana launches 2026 SME Month to drive business growth

Constitutional reform is not a one-party project – Barker-Vormawor

Constitution Review Committee won’t decide what goes into reform bills – Barker-Vormawor

Balogun’s Everton deal collapses after he walks away

Enzo Fernandez joins Man City for joint-British record £125m
Watch related
All videosDon’t stop here

